State-Licensed Electrical Service Upgrade in San Antonio

AdobeStock1877268460

Power for What Comes Next

You get a service that can carry the EV charger, the new AC or the addition, plus a meter base that sits solid on the wall. An electrical service upgrade in San Antonio replaces the gear outside that brings power in, and we coordinate the utility disconnect and reconnect for you. Maybe an installer said your service is too small, or the base is rusted, leaning or beaten up by a storm. Plenty of people call us unsure whether that box is theirs to fix or the utility’s. Under CPS Energy, the meter base is usually the homeowner’s responsibility; the meter belongs to CPS Energy. We replace the base and make the calls to the utility, so you’re not stuck in the middle. Every job is done under JI Hopes, our licensed master electrician, and the permit goes in under our own contractor license.

100 Amp vs 200 Amp Service

Plenty of older homes were wired for 100 amps or less, back before central air, electric dryers and EV chargers shared one roof. That service can still work, but every big appliance you add pulls against the same limit. A 100 amp service in a busy house is like a two-lane road at rush hour, because the road didn’t shrink but the traffic grew. Guesswork isn’t how a new service gets sized. We run a load calculation first and add up the heavy loads, like the AC, the range and any charger you’re planning. The numbers pick the size, and we walk you through them line by line. When the total outgrows 100 amps, 200 amp service is the usual next step. A large home with two AC units, a pool and an EV can need 320 amp service instead. Plans for next year count too, since sizing for a future shop or hot tub now beats upgrading twice.

Meter Base and Mast Replacement

Your meter plugs into a box on the outside wall called the meter base, which CPS Energy calls the meter socket. On an overhead service, a pipe called the service mast climbs past the roof edge, and a hooded weatherhead keeps rain out of the wires. That pipe is usually rigid conduit, because it has to hold up the wires coming off the pole. Inside it, the service entrance wires carry power down into the base and on to your main disconnect, which is usually the main breaker. Some homes have no mast, and service entrance cable runs down the wall instead. Rust, a hard storm or a falling limb can crack the base or pull the mast loose. A meter base pulling off the wall is a real hazard, because the wires feeding it stay live even with your main breaker off. One customer told us the old wires in their outside box had come close to starting a fire before we replaced the whole box. When the service gets bigger, the wires get replaced too, sized for the new service’s ampacity, which means how much current it can carry. A bigger base on the old wires only moves the weak spot. The grounding usually gets brought up to the current code as well, including the grounding rods that tie the system to the earth.

Overhead vs Underground Service Drops

With an overhead service drop, the utility’s wires come off the pole and land at the top of your mast. With an underground lateral, the wires come up out of the ground into the bottom of the meter base, with no mast at all. An overhead upgrade usually swaps the mast along with the base, while an underground one keeps the work low on the wall. JI started in 2002 as a lineman running bucket trucks on utility lines, so he knows the pole side of the job as well as ours. In older Southside homes around Harlandale, the drop, mast and base often need looking at together, since houses that age were wired for smaller loads.

Coordinating the CPS Energy Disconnect

Nobody can safely change a meter base while it’s live, so the utility has to pull the meter or cut the service first. In CPS Energy territory, we set that up through CPS Energy service planning, the CPS Energy side that handles the disconnect. Not every address around San Antonio is on CPS Energy, though. GVEC serves much of Cibolo, and much of Schertz is on GVEC too. Parts of Universal City are on CPS Energy and parts on GVEC, while Boerne and Castroville each run a city electric system. Each utility handles a disconnect and reconnect its own way, so we confirm yours and work it out with them before the day of the job. A base swapped with no permit is a job nobody checked. We pull the permit, and where the city requires it, the inspector signs off before the power comes back. You don’t have to call the utility or chase the inspector, because we coordinate the disconnect, the inspection and the reconnect for you.

Permit Pulled

We pull the permit before work starts, under our contractor license.

Utility Lined Up

We book the disconnect and reconnect with your utility ahead of time.

Inspected Service

An inspector checks the work, and we time the reconnect around it.

When an EV or Generator Forces the Upgrade

Sometimes the upgrade starts with a plan, and the charger installer or the AC company tells you the service is too small. A Level 2 charger, which is a 240-volt home charger, adds a big, steady load to the service. A standby generator can need a newer meter base or a bigger service behind its transfer switch, the box that swaps the house to generator power. An addition, a second AC unit, a pool pump or a new shop adds load the same way. We handle electrical panel upgrades and electrical wiring installation, so the new service, the panel and the new circuit can come from one crew. A 200 amp service needs a panel rated to carry it, so if yours has to change too, that’s part of our electrical panel upgrade work. The new circuit, the 240-volt line or the battery backup falls under our electrical installation service, and the same crew runs it. One crew sizes the service, swaps the panel and runs the new circuit, so nothing gets lost between two companies. Call (726) 268-9306 and tell us what you’re adding or what you see at the meter, and we’ll explain your options before any work starts. We answer any hour, and after hours the situation sets the plan, so sometimes the crew comes out that night and sometimes we make it safe and come back to finish. Our owner has been in the trade since 2002, and we’re a family-owned, licensed and insured electrician.

Did you know?

Around 1900, about a third of the cars on American roads were electric. Henry Ford’s wife, Clara, drove a Detroit Electric, which didn’t need a hand crank to start. Charging a car at home is an old idea that’s back in a big way.

Meter Base Answers

FAQs About Electrical Service Upgrade in San Antonio

My meter base is pulling away from the wall. What should I do?

Stay clear of it and call us, because the utility’s wires are still hot on their side of the base. Don’t push it back or tape it up yourself. Calls are answered any hour, and we set up the utility disconnect before anyone opens the base.

What drives the cost of moving up to 200 amp service?

The main drivers are the new service size and whether your power comes in overhead or underground. The condition of the meter base matters, and so does any mast or weatherhead work. Coordination with CPS Energy or your utility is part of the job too. We’ll look at your setup and explain what it needs before any work starts.

Does the whole house lose power while the base is swapped?

Yes, the whole house goes dark, because the utility has to disconnect the service before anyone can safely open the base. We set that up with your utility, so the utility shutoff is scheduled before the day comes. Plan for it the way you’d plan for a plumber shutting off the water.

Do I need a new breaker panel too, or only a new meter base?

It depends on why you’re upgrading. If a storm damaged the base but the service size is fine, the base and mast may be all that changes. If you’re moving up to a bigger service, the panel usually has to be rated for it too. We’ll tell you which one your home needs after we look at both.

Can you handle a service upgrade if my power comes from GVEC?

Yes. We confirm which utility serves your address and set up the disconnect and reconnect with them ahead of the job.

Does a service upgrade need a permit and an inspection?

Yes. We pull the permit and schedule the inspection, so an inspector looks over the new service. The work is done under TDLR Electrical Contractor licensed and insured #35520. Each city around San Antonio issues its own electrical permits, and we handle that part for you.

Is an underground service harder to upgrade than an overhead one?

It depends on the setup. With an overhead drop, the mast and weatherhead often get replaced along with the base. With an underground lateral, the wires come up from below, so the work stays low on the wall. We’ll look at your service and explain what changes on your wall.

Can you upgrade the service on a mobile or manufactured home?

Yes, mobile home service and meter-loop work is part of what we do. The meter base and disconnect sit on a pedestal or pole instead of a wall, and the utility coordination works the same way. Tell us the setup when you call and we’ll explain what changes.

Don’t see what you’re looking for?

We’re happy to answer your questions.

AdobeStock 1021345338

The right electrician changes everything. Complete service for your home or commercial property.

Could you help us with a review?

We sure could use your help letting San Antonio know how good we are.

Copyright © 2026 Green Light Electric | 4700 Timco W, San Antonio, TX 78238 | Licensed & Insured · Green Light Electric License #TDLR35520